Energy Design & Consulting developed the technical design and specifications for the power supply of the Cluster Power data centre in Mischii, Craiova, the largest data centre in Romania and the sixth largest in Europe. The centre will be powered by electricity produced by a natural gas power plant that Cluster Power will build on the Mischii campus, and the back-up power supply will be at 110kV from the national electricity transmission grid (220/110/20kV North Craiova station).